Solar Panels in Montana:
Is It Worth It in 2026?
Montana averages 1268.8 kWh per kWp per year with 4.9 peak sun hours per day. At 12.86¢/kWh, an 8 kW system saves roughly $1,305/year and pays back in about 11.6 years.
Montana Solar at a Glance
EIA data updated: April 11, 2026 · EIA, PVGIS v5.3
Solar Incentives in Montana
The 30% federal solar tax credit (Section 25D) expired December 31, 2025. Cash and loan purchases no longer qualify. State incentives below still apply.
Full retail net metering, property tax exemption
Utility rebates, exemptions, and net metering still apply. Federal ITC expired Dec 2025. Property value increase is tax-exempt.
All Available Incentives in Montana
How Much Solar Power Do Montana Cities Get?
Real PVGIS yield data and EIA electricity rates for all 3 cities. Click any city for detailed payback calculations.
Enter your monthly bill — get exact payback numbers for Montana.
Full breakdown of credits, rebates, net metering, and SREC programs.
Solar in Montana: Frequently Asked Questions
Is solar worth it in Montana?
What solar incentives are available in Montana?
How much electricity do solar panels produce in Montana?
How much do solar panels cost in Montana?
Going Solar in Montana: Step by Step
From first quote to first kilowatt — here is the typical timeline for a residential solar installation in Montana. Most homeowners complete this process in 6–12 weeks.
- 1Get 3 quotes
Prices in Montana average $22,400 for an 8 kW system before incentives. Getting three quotes typically saves 10–15%. Use the same system size so you can compare apples to apples.
- 2Review your electricity bill
Your last 12 months of usage determines the right system size. At 12.86¢/kWh in Montana, a system that offsets 90% of your bill hits the best cost-per-kWh sweet spot.
- 3Check state incentives
Montana does not have a statewide solar tax credit, but utility rebates and net metering may still apply. Full retail net metering.
- 4Sign contract & apply for permits
Your installer pulls the building permit and files interconnection paperwork with your utility. Permit approval in Montana typically takes 1–4 weeks depending on your county.
- 5Installation day
A standard 8 kW residential installation takes 1–2 days. Racking goes on first, then panels, then the inverter is wired to your main panel. The crew usually keeps the power on throughout.
- 6Utility inspection & interconnection
After installation your utility inspects the system and approves grid connection. This final step can take 1–3 weeks. Once approved, your meter tracks both import and export.